Situated near Nimmitabel in the Snowy Monaro region and was developed in two stages, with the first stage comprising 67 wind turbines that have a total installed capacity of 113 MW.
This stage was completed and became operational in 2014. Stage 2 was completed in 2021. This stage added an additional 32 MW of capacity through the installation of more wind turbines, increasing the total capacity of the wind farm to around 146 MW.
The initial project was developed as part of a joint venture with CWP (now Squadron Energy), which ended in 2016.
Stage 2 - 20 wind turbines (100MW)